Mathseeds

Mathseeds School Edition

Start your FREE trial today!

+1 877 467 6851 customerservice@3plearning.ca

An Online Math Program That Really Works

Mathseeds is a sequential online math program where all students
begin ‘where they are’ and improve their performance as they progress through
a standards-based continuum.

How Do the Online Math Lessons Work?

Lessons are carefully tailored to each student's ability

online
  • 190 sequential lessons from kindergarten to grade 3 ensure that students make progress at every single Mathseeds session.
  • 50 online lessons at each grade level cover all domains: number, operations, algebra, geometry, measurement, and data.
  • Students begin at a level that matches their ability level.

Structured online lessons are clear and simple to follow

online
  • Math lessons begin with child-friendly, step-by-step instruction.
  • Students complete guided practice activities and then move on to independent practice and skill development.
  • Students develop critical thinking and problem solving skills.

Motivating format encourages student progress

online
  • Online activities are designed to engage students and are created to prevent guessing, as children need to get most questions correct before they can move on.
  • Students are motivated to complete lessons and move forward in the program.
  • Children are excited to make progress and to move onto a new map.

Students complete regular assessment tasks

online
  • The end-of-map quiz tests students’ knowledge of the previous five lessons. Students have to do well on this quiz to move on to the next map.
  • Mathseeds Driving Tests assess skills in six core areas across each grade level. These tests assess student progress, and class reports show student strengths and weaknesses.
  • Use Mathseeds printable tests to check student growth with domain-specific written tests for all standards.

Mathseeds works because students are engaged and motivated to succeed as they master essential standards-based skills in the program.

As this teacher says:

“
  1. The kids love it, so it’s motivational.
  2. Parents like it, so kids use it at home.
  3. I like the feedback I get, so I can track progress.
  4. That it’s available to the kids, even when school is out.
”
Get started